Reed Avenue Improvements
Transportation
reconstruction of the pavement structural section between Reed Avenue and āIā Street and Manning Avenue [ Read More...]
South County Justice Center
Industrial
The project consisted of placing, compacting, and finishing approximately 6,200 tons of aggregate base rock followed by paving approximately 3,800 tons of asphalt [ Read More...]
Road 36 Culvert Replacement
Transportation
Removal of existing timber culvert and construction of a new concrete culvert [ Read More...]
Construction of Road 28 Bridge Replacement at Cottonwood Creek
Transportation
The project consisted of removing an existing 22-foot wide by 200-foot long bridge over Cottonwood Creek [ Read More...]
Construction on State Highway in Monterey County
Transportation
This project consisted of placing a polyester concrete overlay, treating bridge decks with methacrylate, approach slab removal [ Read More...]
Madera High School On-Site & Off-Site Improvements
Educational
The Madera High School South Campus On-Site and Off-Site Improvements Project was an addition [ Read More...]
Jensen Avenue Overhead Rehabilitation and Seismic Retrofit
Transportation
This project consisted of rehabilitation and seismic retrofit of an approximately 650 foot long grade separated structure [ Read More...]
Gaston Middle School
Educational
This project consisted of offsite City of Fresno ADA compliant concrete improvements for the construction of Gaston Middle School
[ Read More...]
Edison High School
Educational
The project consisted of multiple mobilizations to complete 7,702 CY of cut to fill and overexcavation and 1,185 CY of import [ Read More...]
Dry Creek Park
Parks and Beautification
Construct new park with play equipment, shade structures, and picnic areas [ Read More...]
Crane Valley Dam Seismic Retrofit Project
Transportation
The initial phase of the project included overlaying Road 222 to increase the structural section of the roadway [ Read More...]
California Veterans Home
Industrial
During construction operations, 7 buildings were simultaneously being constructed [ Read More...]
Betty Drive/Avenue 312
Transportation
The project consists of realignment and widening of Betty Drive from a 2-lane to a 4-lane roadway [ Read More...]
Eastwood Power Station Access Road
Transportation
Demolition of existing concrete curb; clear and grub [ Read More...]