Proud Projects of American Paving Co.

Reed Avenue Improvements

reconstruction of the pavement structural section between Reed Avenue and ā€œIā€ Street and Manning Avenue [ Read More...]

South County Justice Center

The project consisted of placing, compacting, and finishing approximately 6,200 tons of aggregate base rock followed by paving approximately 3,800 tons of asphalt [ Read More...]

Road 36 Culvert Replacement

Removal of existing timber culvert and construction of a new concrete culvert [ Read More...]

Construction of Road 28 Bridge Replacement at Cottonwood Creek

The project consisted of removing an existing 22-foot wide by 200-foot long bridge over Cottonwood Creek [ Read More...]

Construction on State Highway in Monterey County

This project consisted of placing a polyester concrete overlay, treating bridge decks with methacrylate, approach slab removal [ Read More...]

Madera High School On-Site & Off-Site Improvements

The Madera High School South Campus On-Site and Off-Site Improvements Project was an addition [ Read More...]

Jensen Avenue Overhead Rehabilitation and Seismic Retrofit

This project consisted of rehabilitation and seismic retrofit of an approximately 650 foot long grade separated structure [ Read More...]

Gaston Middle School

This project consisted of offsite City of Fresno ADA compliant concrete improvements for the construction of Gaston Middle School
[ Read More...]

Edison High School

The project consisted of multiple mobilizations to complete 7,702 CY of cut to fill and overexcavation and 1,185 CY of import [ Read More...]

Dry Creek Park

Construct new park with play equipment, shade structures, and picnic areas [ Read More...]

Crane Valley Dam Seismic Retrofit Project

The initial phase of the project included overlaying Road 222 to increase the structural section of the roadway [ Read More...]

California Veterans Home

During construction operations, 7 buildings were simultaneously being constructed [ Read More...]

Betty Drive/Avenue 312

The project consists of realignment and widening of Betty Drive from a 2-lane to a 4-lane roadway [ Read More...]

Eastwood Power Station Access Road

Demolition of existing concrete curb; clear and grub [ Read More...]