Eastwood Power Station Access Road

Location: Shaver Lake, California
Completion Date: October, 2008

Demolition of existing concrete curb; clear and grub; grind and overlay 3.1 miles of existing asphalt concrete; and traffic striping.

Owner:

Southern California Edison
Hydro Northern – Services Generation
55481 Poplar Road
Big Creek, CA 93605

Owner Contact:
Jim Hair, Project Inspector
(909) 747-5826

Design Engineer:

Blair, Church & Flynn
451 Clovis Avenue
Suite 200
Clovis, CA 93612

Engineer Contact:
David Mowry
(559) 326-1400

American Paving Co.:

Jimmy Brager, P.M.
(559) 268-9886