Betty Drive/Avenue 312 Realignment and Improvement Project, Phase 2B
Location: Tulare, California
Completion Date: August 2012
The project consists of realignment and widening of Betty Drive from a 2-lane to a 4-lane roadway from State Route 99 to Robinson Road. Work includes construction of a new concrete box girder bridge (320 ft. long by 88 ft. wide) over the railroad, earthwork, storm drainage, retaining wall, sound wall, traffic signals, street lighting, asphalt concrete, curbs, sidewalk and pavement delineation.Owner:
Tulare County Redevelopment Agency
Owner Contact:
Phil Slitor
559-624-7000
American Paving Co. PM:
Jimmy Brager
Design Engineer:
Omni-Means
330 Hartnell Avenue, Suite B
Redding, CA 96002
Engineer Contact:
Russ Wenham
(530) 242-1700
American Paving Co.:
Jimmy Brager, P.M.