Madera High School On-Site & Off-Site Improvements

Location: Madera, California
Completion Date: 2006

The Madera High School South Campus On-Site and Off-Site Improvements Project was an addition to the second High School built in Madera. Construction of the 48-acre site included 24,000 cubic yards of excavation and re-compaction, 191,000 cubic yards of import borrow, 16,300 tons of aggregate base, 8,600 tons of asphalt concrete, and 2,800 cubic yards of portland cement concrete. The site also included construction of 4 softball fields, 2 baseball fields, football field, clay athletic track, 6 basketball courts, and 8 tennis courts. The completed project is now enjoyed by the students of Madera Unified School District.

Owner:

Madera Unified School District
1205 Madera Avenue
Madera, CA 93637

Owner Contact:
Kelly Porterfield
(559) 675-4548

Design Engineer:

Blair, Church, & Flynn Consulting
Engineers
451 Clovis Avenue
Clovis, CA 93612

Engineer Contact:
Alan Mok
(559) 291-2945

American Paving Co.:

Chuck McConnon, P.M.
(559) 268-9886